NOC Chairman Inspects Mabruk Field to Finalize Rehabilitation Works
Mabruk Oil Field – March 7, 2026
In a push to bolster national energy output, the Chairman of the National Oil Corporation (NOC), Eng. Masoud Suleiman, conducted a field inspection of the Mabruk oil field. The visit aimed to oversee the final stages of the field’s rehabilitation project and the connection of new production lines.
Accompanying the Chairman was a high-level delegation from Mabruk Oil Operations, led by the Chairman of the Management Committee, Eng. Adel Al-Koni, alongside committee members Dr. Mousa Abultwirat and Eng. Saleh Ibrahim, as well as the Rehabilitation Project Manager, Eng. Ibrahim Al-Sharif, and his technical team.
Key Highlights of the Inspection:
Early Production Facility (EPF): The delegation reviewed operational progress at the EPF station.
Strategic Pipeline: Officials inspected the work on the critical 10-inch production line.
Operational Readiness: The visit focused on ensuring all technical works meet the designated timeline while adhering to the highest international safety and quality standards.
Strategic Importance
This visit aligns with the NOC’s broader strategy to scale up daily production rates and modernize Libya’s oil infrastructure. By providing direct oversight and resolving logistical challenges on-site, the NOC aims to return the Mabruk Field—a vital pillar of the Libyan energy sector—to full capacity.
The successful restoration of the field is expected to provide a significant boost to the national economy through increased energy exports