Skip to main content

Procurements Announcement

Category: Procurements Announcement

Installation of Booster pump skid on Test Separator

Mabruk Oil Operations (hereinafter referred to as the MOO) invites interested local and international companies (or their representatives), that are specialized and competent in providing installation of Booster pump skid on Test separator to participate in the Pre-qualification process.
The participant should have the required technical and financial resources and submit to Mabruk Oil Operations their completed Pre-qualification documents in accordance with the provisions included in this announcement and detailed in the pre-qualification questionnaire for evaluation.

Supply & INSTALLATION OF the ABSORPTION WALL FOR NOISE REDUCTION

Announcement (Pre-qualification Invitation)

Mabruk Oil Operations (hereinafter referred to as the MOO) invites interested local and international companies (or their representatives), that are specialized and competent in providing Supply & INSTALLATION OF the ABSORPTION WALL FOR NOISE REDUCTION to participate in the Pre-qualification process.

The formal request shall be sent to the Procurement Committee coordinator by email or fax, strictly to the following address:
Mr. Abdussalam ASAGHAIR
Procurement Committee Coordinator
Email: abdussalam.asaghair@mabruk-oil.com
Tel: +(218) 21 33 50 401/5 Ext. 1399
The following information must be mentioned in the e-mail subject of the formal request
(Name of participant – TO SUPPLY & INSTALL AN ABSORPTION WALL ON FARAWAH AT ALJURF OILFIELD – Pre-qualification questionnaire request).
Schedule This announcement will remain posted on the NOC & Mabruk Oil Operations websites until 30/06/2022 The last date to receive the prequalification documents from the participants is 07/07/2022. Accordingly, all interested companies should submit the required Pre-qualification information no later than this date. Any document submitted after this date will be disregarded.

Category: Procurements Announcement